Frame Maintain
Loading…
All Jobs
Job
Financials
Tools
Library & Settings
Jobs
Job Identity
Controls which panels are visible in the sidebar.
Site
Client
Technical Defaults
Job-wide default. Override per opening in Door Design.
Used for fixings calculation and door pricing. Override per opening.
Standard mix ≈ 0.015.
Opening H = (I/R + front archi) + this margin.
Opening W = (I/R + 2× front archi) + this margin.
Quote Approval
Record client approval before issuing supplier purchase orders
FRL Solid Other
Frame Design Select an opening
0
Complete
0
In progress
0
Not started
0%
Select an opening to begin
Choose an opening from the list to specify its frame details
Door Defaults — Apply to openings
Standard & core inherit from Project Setup unless overridden here
Opening Location Size (H×W) Handing Category Rating Finish Thick Extras Unit Price Status
Order Details
Select Openings for this PO
No openings with Frame Design data yet.
Order Details
Select Openings
No openings in the register yet.
Order Details
Opening Schedule & Contract Rates
Rates drawn from Quote Builder — adjust as needed
Open from Documents Hub to populate openings.
Total ex GST $0
0 doorsets 0 pass 0 fail 0 pending 0 critical defects
No doorsets recorded yet. Tap "+ Add Doorset" to begin.
0 openings 0 tasks assigned 0 complete Est. total: $0
No openings found. Add openings in the Opening Register first.
Markup Settings
Applied per category. Shown as markup % — resulting margin shown alongside.
= 28.6% margin
= 28.6% margin
= 23.1% margin
= 20.0% margin
Labour
Frame Installation Enter labour rate per frame — override per opening as needed
Frame installation subtotal $0
Door & Hardware Installation Auto from DMPL — override hang rate per opening
Labour subtotal (ex markup) $0
Materials
Frame Supply
Calculated from Frame Design
Calculated:
$0
AAFD quoted:
$
Using:
Active cost
$0
Door Supply
Calculated from Door Design
Calculated:
$0
AAFD quoted:
$
Using:
Active cost
$0
Hardware Supply
Supplier quoted/invoiced amount (ex GST)
$
Materials subtotal (ex markup) $0
Administration
Admin subtotal (ex markup) $0
Consumables Allowance
Screws, packers, silicone, drill bits & other job-site sundries
Prime Cost & Provisional Sum
Contract allowance items — passed through at nominated amount
Prime Cost Items Passed through at cost — no markup
PC subtotal $0
Provisional Sum Items Allowance for undefined scope
PS subtotal $0
Summary
TOTAL EX GST $0
Working Away From Home
Travel, accommodation & incidentals for regional jobs
Employee Allowance — your cost
Employee cost total $0
Client Quote — what you charge
Travel day labour: —
Return km: —
Other items
Client quote total $0
Document Register
All documents generated for this job
No documents generated yet. Click + New Document to create one.
Schedule Details
0 openings · 0 items
Controlled in Pricing Manager — Labour markup applies to all hardware install labour.
No hardware items yet. Import a PDF schedule or add openings manually.
Pricing Tier & Margin
(e.g. 1.20 = 20% margin)
Pricelist Details
Contract Summary
From Quote Builder
Invoice Register
Claimable Work
This claim (ex GST) $0
GST (10%) $0
Total inc GST $0
Previously claimed $0
Remaining contract value
Certifier tick-selection: Select the openings to include in the compliance document. Only active FRL-rated openings are shown. Site IDs (D03, not D03.CARLS) are used per architectural convention. Superseded openings are excluded automatically.
0 selected
Variations
Inclusions
Exclusions
Product Library
Frame Spec Manager
Frame profiles, fire ratings, core types and wall configurations shared across all jobs.
Pricing Manager
DMPL labour rates, markup tiers and quote defaults used across all jobs.
Clause Library
Reusable inclusion and exclusion clauses for quotes. Build up your standard conditions over time.
Product Library
Hardware products, door and frame catalogues. Shared across all jobs.
Job Numbering
Six-digit sequential job numbers, starting number and leading zeros display.
Building Register
Fire door inspection contracts, doorset registers and service visit records.
Contacts
Suppliers, subcontractors and client contacts available to all jobs.
Source Documents
Hardware schedules and reference documents imported from suppliers.
Defect Library
Pre-populated defect descriptions and severity hints for maintenance inspections.
App Settings
Google Drive sync, storage management and display preferences.
Library data is shared across all jobs. Changes here take effect immediately in every job.
Severity shown here is a hint only — the AS1851 two-question flow always runs at inspection time and sets the actual classification on the record. Items marked Critical or Non-conformance pre-select the likely answer, but the inspector confirms.
0 buildings
Select a building
Click a building in the list to view its details, doorset registers and inspection history.
Google Drive Sync
Saves job data and photos to Drive
Use / to separate parent from job — e.g. Hamilton Island / Reef View Hotel
Backup & Data
Export and import job data files
Export
Downloads all job data including photos as a single JSON file. Use as a backup or to transfer between devices.
Import
Restores job data from a previously exported JSON file. Replaces all current data.
Device Identity
Who is signed in on this device. Reset to show the sign-in screen on next load.
Clear Session
Wipes all saved data from this device. Cannot be undone. Export first if you need a backup.
AI Features — API Key
Required for AI Import in Hardware Schedule
Enter your Anthropic API key to enable AI-assisted hardware schedule import. The key is stored only in your browser's local storage and is never sent anywhere except directly to Anthropic's API. Get a key at console.anthropic.com.
About
Application
Frame Maintain
Project Manager
Build
2026-05-17
Developer
Frame Maintain Pty Ltd
framemaintain.com.au
Local Storage
Calculating…
Sync to Drive first, then free local copies of Drive-backed photos.
Storage breakdown
Click Refresh to analyse.
Source Documents
Me
Signed in
Signed in as
?
Current Job